DMAIC phases and roles
The five DMAIC phases with outputs and tools, and Six Sigma roles.
| Phase | Goal | Typical outputs and tools |
|---|---|---|
| Define | Agree the problem, scope, customer and goal | Project charter, SIPOC, voice of the customer, CTQ tree |
| Measure | Measure the current process reliably | Process map, data collection plan, Gage R&R, baseline capability |
| Analyze | Find and prove the root causes | Pareto, fishbone, 5 Whys, hypothesis tests, regression |
| Improve | Develop, test and implement solutions | DOE, pilot, FMEA, poka-yoke, cost-benefit |
| Control | Keep the gains | Control plan, control charts, standard work, handover |
DMADV (Define, Measure, Analyze, Design, Verify) is used to design a new process or product instead of improving an existing one.
| Role | Typical responsibility |
|---|---|
| Champion / sponsor | Chooses projects, removes barriers |
| Master Black Belt | Coaches Black Belts, owns methods |
| Black Belt | Leads complex projects full time |
| Green Belt | Leads smaller projects alongside a regular job |
| Yellow Belt | Team member who knows the basics |
