The five lean principles, the eight wastes, value stream mapping, flow, pull, 5S, SMED, OEE and the key formulas.

Lean is a way of running operations that maximizes customer value while removing waste. It grew out of the Toyota Production System, developed by Taiichi Ohno and others; the term "lean" spread after the 1990 book The Machine That Changed the World.

Five principles (Womack and Jones)

  • Value: define it from the customer's point of view.
  • Value stream: map every step and remove those that add no value.
  • Flow: make the remaining steps flow without interruption.
  • Pull: produce only what the next step or customer needs.
  • Perfection: improve continuously.

The eight wastes (DOWNTIME)

Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing.

Core tools

  • Value stream mapping: one-page map of material and information flow with times; shows how little of the lead time adds value.
  • 5S: Sort, Set in order, Shine, Standardize, Sustain.
  • Standard work: the current best sequence, timing and inventory for a job.
  • Kanban: cards or signals that trigger replenishment (pull).
  • SMED: reduce changeover time by separating internal work (machine stopped) from external work (machine running) and moving work outside.
  • Poka-yoke: mistake-proofing so an error cannot happen or is caught immediately.
  • Jidoka: stop automatically when a problem occurs.
  • Heijunka: level the mix and volume of production.
  • Kaizen: continuous improvement, often in short focused events.
  • Gemba walks: go to where the work happens.

Formulas

Example: 450 available minutes per shift and demand of 900 parts per shift gives a takt time of 0.5 min (30 s) per part.

World-class OEE is often quoted at around 85%; many plants run at 40% to 60%.

Questions and answers

Does lean mean cutting people?

Lean done well frees people from waste so they can do more valuable work. Using it to cut staff destroys the trust that continuous improvement depends on.

How do SPC and lean fit together?

Lean needs stable processes: flow and low inventory break down if processes are unpredictable. SPC provides that stability.