Resources What's New Support Download Contact Sales: Arthur-Industrial@outlook.com
Home › Resources › Lean terms and formulas

Lean terms and formulas

The 8 wastes, 5S and other lean terms, with takt time, OEE and Little's law.

ConceptMeaning
8 wastes (DOWNTIME)Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing
5SSort, Set in order, Shine, Standardize, Sustain
Value stream mapA one-page map of material and information flow, showing value-added and waiting time
KaizenContinuous improvement in small steps, often in short focused events
KanbanA visual signal to replenish only what was used (pull)
Just in timeMake what is needed, when it is needed, in the amount needed
SMEDSingle-minute exchange of die: reduce changeover time by moving work outside the stoppage
Poka-yokeMistake-proofing a step so an error cannot happen or is caught at once
JidokaStop the process automatically when a problem occurs
HeijunkaLevel the production mix and volume over time
GembaThe place where the work is done; go and see
Standard workThe current best method, written down and followed
PDCAPlan, Do, Check, Act: the basic improvement cycle
Takt time
OEE
, , .
Little's law
Process cycle efficiency

← All articles