Lean terms and formulas
The 8 wastes, 5S and other lean terms, with takt time, OEE and Little's law.
| Concept | Meaning |
|---|---|
| 8 wastes (DOWNTIME) | Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing |
| 5S | Sort, Set in order, Shine, Standardize, Sustain |
| Value stream map | A one-page map of material and information flow, showing value-added and waiting time |
| Kaizen | Continuous improvement in small steps, often in short focused events |
| Kanban | A visual signal to replenish only what was used (pull) |
| Just in time | Make what is needed, when it is needed, in the amount needed |
| SMED | Single-minute exchange of die: reduce changeover time by moving work outside the stoppage |
| Poka-yoke | Mistake-proofing a step so an error cannot happen or is caught at once |
| Jidoka | Stop the process automatically when a problem occurs |
| Heijunka | Level the production mix and volume over time |
| Gemba | The place where the work is done; go and see |
| Standard work | The current best method, written down and followed |
| PDCA | Plan, Do, Check, Act: the basic improvement cycle |
Takt time
OEE
, , .
Little's law
Process cycle efficiency