Resources What's New Support Download Contact Sales: Arthur-Industrial@outlook.com
Home › Resources › Sample size and power

Sample size and power

How many units you need to estimate a value or detect a difference, and the inputs every sample size calculation needs.

A sample size calculation balances cost against the risk of a wrong conclusion. Every calculation needs the same four ingredients.

The inputs

  • Significance level α (false alarm risk), usually 0.05.
  • Power (1 − β), usually 0.80 or 0.90.
  • The difference that matters (for example, a shift of 0.01 mm), chosen from engineering, not statistics.
  • The process standard deviation, from past data or a pilot study.

Common formulas

With α = 0.05 (two-sided) and 80% power, . To detect a difference of one standard deviation you need about 16 units per group; for half a standard deviation, about 63.

Practical guidance

  • Control chart limits: 20 to 25 subgroups (about 100 values).
  • Capability study: at least 100 values over representative conditions; 30 gives a very wide interval on Cpk.
  • Gage R&R: commonly 10 parts, 3 operators, 2 or 3 trials.
  • Reliability demonstration with zero failures: .

Questions and answers

I can only afford 10 parts. Is that useless?

It can still detect large differences. Use a power calculation to see what difference 10 parts can detect, and report the confidence interval honestly.

In RS-1: Quality > Sample Size and Reliability > Sample Size.

← All articles