Process capability: Cp, Cpk, Pp, Ppk
What capability indices mean, within vs overall sigma, typical targets, and the most common mistakes.
Capability compares the spread of a stable process with its specification limits. It answers: will this process make good parts consistently?
The indices
- Cp shows potential: how well the spread would fit if the process were perfectly centered.
- Cpk shows actual short-term performance, including off-center.
- Pp / Ppk use the overall (long-term) standard deviation, which includes shifts between subgroups.
- Cpm also penalizes distance from the target value.
Within vs overall
comes from , or . is the ordinary standard deviation of all the data. If Ppk is much lower than Cpk, the process mean moves between subgroups: stabilize it before anything else.
Targets
- Cpk 1.00: each side, about 2,700 ppm out of spec if centered.
- Cpk 1.33: a common minimum for ongoing production.
- Cpk 1.67: a common requirement for new processes (PPAP) and critical characteristics.
- Cpk 2.00: the Six Sigma ideal (before the conventional shift).
Before you trust the number
- The process must be stable. Capability of an unstable process predicts nothing.
- The data must fit the assumed distribution (usually normal).
- The measurement system must be adequate (Gage R&R).
- Use enough data (100 or more) from representative conditions.
One-sided specs
With only an upper limit (flatness, runout), only Cpu (Ppu) is meaningful. Cp cannot be calculated.
Questions and answers
Cpk is 1.6 but Ppk is 0.9. Which is right?
Both. Cpk says what the process can do when it does not move; Ppk says what it actually delivered. The gap means special causes or drift between subgroups. Fix the instability and the two will come together.
Can Cpk be negative?
Yes, if the average is outside a specification limit.
